Fibre optic

Electric Tools string vs. Fibre optic

lecvfib.jpg• Long tools – 30-50ft long

• Down hole electronics

• Crane required

• Grease injection tubes required for pressure seal around braided wireline, can be very long for HP wells

Intelligent SlickLINE or StiffLINE

mocktool.jpg

•  Very compact and short (can be transported in helicopter)
•  PLT 3-4ft long
•  No down hole electronics (increased reliability and significantly lower cost of manufacture and
   repair)
•  Shorter and faster rig up
•  Simple and reliable pressure seal around slickline
•  Services can be performed on wellhead deck (minimum interference to other rig activities)

Production logging with braided line

• Long tools
• Down hole electronics
• Crane generally required
• Grease injection tubes required for pressure seal around braided wireline

stick.jpg

 

Intelligent Slickline

•  Very compact and short (can be transported in helicopter)
•  PLT 3-4ft long
•  No down hole electronics (increased reliability and significantly lower cost of manufacture and repair)
•  Shorter and faster rig up
•  Simple and reliable pressure seal around slickline
•  Services can be performed on wellhead deck (minimum interference to other rig activities)

StiffLINE unit set up for wellhead deck

STIFFLINE UNIT1.jpg

STIFFLINE UNIT pic1.jpg

Technology Position in Detail

turbo1.jpg